mavial.pl

Construction Cost Estimate Services — US & EU

Fixed-fee estimating with **USD pricing**: BOQ & QTO (CSI / RICS NRM), RSMeans city cost index, and BIM takeoff from IFC/Revit/Tekla. Delivery in 2–7 business days, rush in 48–72h.

Transparent fixed-fee packages (USD) — US & EU

Starter

Concept ROM (≤150 m²)

$429EU baseline
$499USA

Over limit: EU $1.70/m², USA $2.00/m²

  • BOQ (summary), CSI/NRM split
  • PDF + XLSX deliverables
  • 2–3 business days
  • 1 revision included
Most popular

Standard DD/Permit (≤500 m²)

$1,490EU baseline
$1,690USA

Over limit: EU $2.70/m², USA $3.20/m²

  • Detailed BOQ, assumptions log
  • PDF/XLSX + source tables
  • 3–5 business days
  • 1 revision included
Pro

Bid/Tender (≤2,500 m² or ≤8 trades)

$4,290EU baseline
$4,990USA

Over limit: EU $3.50/m², USA $4.30/m²

  • Cross-trade check, VE alternates
  • Schedule of Values (SOV)
  • 5–7 business days
  • 2 revisions included
Enterprise

Complex / Industrial

$8,690+EU baseline
$10,490+USA

Custom scope, SLA, multi-site

  • Workshops & risk allowances
  • Executive report + BOQ
  • Timeline per scope
  • Change management plan

Reference $/m² ranges by scope

Scope EU USA Notes
Residential — Concept (ROM) $1.35–2.75/m² $1.60–3.25/m² AACE Class 5 ±25%
Residential — Detailed $2.75–5.50/m² $3.30–6.60/m² Drawings + specs (Class 3)
Commercial — Detailed $3.30–7.70/m² $4.40–9.90/m² Multi-trade, vendor quotes

How we estimate (method & deliverables)

  • BOQ & QTO: CSI MasterFormat / RICS NRM; SOV included
  • Localization: RSMeans city cost index (US) • EU country indices
  • BIM-native QTO: IFC / Revit / Tekla sources reduce scope gaps
  • Assumptions log & VE: three cost-saving alternates (Pro+)
  • Classes: ROM (AACE Class 5), Design (Class 3), Bid (Class 2)
  • Outputs: PDF & XLSX; change log and revisions per package

Terms & inputs

  • Minimum order: EU $330, USA $390
  • 50% upfront, 50% on delivery (USD)
  • NDA by default; 7 days free revisions
  • Regional multipliers: Nordics +15%, DACH +10%, UK/IE +12%, CEE 0%, Southern EU +5%
  • Inputs: drawings/models, specs, ZIP/city, deadlines
  • Rush: 72h +15%, 48h +30%

Prices are indicative; final fixed quote depends on drawings, trades and timeline.

Why choose MaViAl for construction estimating

Dual-market expertise: RSMeans (US) & EU indices for location-adjusted pricing.

BIM-native takeoff: We read IFC/Revit/Tekla to align quantities across trades.

Speed with quality: 2–7 day turnaround, assumptions log, and SOV.

Transparent fees: Clear packages, $/m² guidance, rush options when needed.

Related BIM & construction pages

Contact & messengers

MaViAl Sp. z o.o.
KRS 0001058460 • NIP 8971927502 • REGON 52642047900000
Wrocław, 50-078, ul. Stanisława Leszczyńskiego 4/29

+48 536 198 779+49 1522 770 4748
vialtim@gmail.com

FAQ — Construction Cost Estimate

What inputs do you need?

Drawings/models (PDF/IFC/Revit/Tekla), outline specs, target location (ZIP/city) and timeline. We confirm assumptions before pricing.

How accurate is a concept vs detailed estimate?

Concept ROM typically ±25% (AACE Class 5). Detailed BOQ narrows variance using drawings, specs and vendor quotes (Class 3/2).

Do you localize to EU countries and US states?

Yes — RSMeans city cost index for the USA and EU country indices. Regional multipliers are listed above.

What about rush timelines and revisions?

Rush +15% (72h) or +30% (48h). Each package includes free revisions (1–2 cycles) within 7 days after delivery.

How do we pay and can you bill in EUR?

Base pricing is in USD (50% upfront, 50% on delivery). We can quote in EUR on request.