BIM Drafting (Revit) — LOD 200/300 from $5.39/m²
Outsource BIM drafting for Architecture, Structure & MEP (LOD 200–300): clear USD per m² pricing, sheet & hourly options, fixed packages, and an instant estimator. Typical delivery is 7–14 days for US & EU projects. Updated: —
US searchers often compare by ft²: EU baseline equals roughly $0.50–$1.11/ft² depending on discipline & LOD. Minimum project $550. First-project discount −10% or fixed pilot price for ≤500 m².
BIM drafting pricing by discipline and LOD (USD)
EU baseline in USD • USA = EU × 1.15. Minimum project $550. Typical scope: AR/STR/MEP models (LOD 200–300), draft sheets, and 1–3 revision rounds. Standard payments 40% / 40% / 20%.
- up to 200 m² • Architectural BIM drafting LOD 200
- up to 10 sheets (A1/A0)
- 1 revision round for concept comments
- up to 500 m² • AR/STR/MEP BIM drafting LOD 200
- up to 25 sheets for preliminary coordination & pricing
- 2 revision rounds with clash-aware updates
- up to 1,200 m² • LOD 200–300 for AR/STR/MEP
- up to 60 sheets for tender & stakeholder review
- 3 revision rounds and coordination notes
Base rates per m² (LOD 200 / 300)
| Discipline | LOD | EU $/m² | USA $/m² |
|---|---|---|---|
| Architectural BIM drafting | 200 / 300 | $5.39 / $8.25 | $6.20 / $9.49 |
| Structural BIM drafting | 200 / 300 | $6.49 / $9.79 | $7.46 / $11.26 |
| MEP BIM drafting (HVAC/Elec/Plumb) | 200 / 300 | $7.59 / $11.99 | $8.73 / $13.79 |
Sheet prices
| Format | EU $/sheet | USA $/sheet |
|---|---|---|
| A1 | $65 | $75 |
| A0 | $98 | $113 |
Hourly rates (optional)
| Role | EU $/h | USA $/h |
|---|---|---|
| Drafter | $32 | $37 |
| BIM Modeler | $43 | $49 |
| BIM Coordinator / Clash | $50 | $57 |
| BIM Lead | $65 | $75 |
How BIM drafting works — scope, inputs & QA
What we need to start
- Plans/elevations/sections (PDF/CAD) + sketches or markups
- Scope: discipline and LOD (LOD 200/300 matrix)
- Region & standards (US/EU), title block, naming, sample sheet set
- Deliverables list (PDF/DWG/RVT/IFC/COBie), milestones, deadlines
What you receive
- Models at LOD 200–300 (Revit-native) + IFC for coordination
- Sheet set (A1/A0) in PDF + native files for your team
- Issues log and coordination notes; major clashes highlighted
- 1–3 revision rounds depending on the selected package
Instant BIM drafting estimate calculator (USD)
Note: this is an instant estimate for scoping. Final quote may adjust for complexity, discipline overlap, and file quality.
Related BIM & construction pages
Explore more BIM design services that connect with Revit, Tekla and construction documentation.
BIM drafting — FAQ
What affects BIM drafting price the most?
Main drivers are discipline (AR/STR/MEP), LOD level (200 vs 300), project area (m²), number of sheets, rush options, and special deliverables such as IFC/COBie or Point Cloud to BIM.
What is the difference between LOD 200 and LOD 300?
LOD 200 is schematic/preliminary geometry and systems layout for early coordination and budgeting. LOD 300 adds more defined geometry, sizes, and placements suitable for coordinated draft sets and stakeholder reviews.
Do you price per m² or per ft²?
Pricing is per m² (USD) with an optional sheet component. For US comparison by ft², 1 m² ≈ 10.76 ft². EU baseline roughly equals $0.50–$1.11 per ft² depending on discipline and LOD.
Can we start with a fixed package and expand later?
Yes. Start with a pilot package (e.g., up to 200–500 m²), then extend by per-m² or hourly work as the scope grows.
Which files do you deliver?
Typical deliverables: Revit-native files (RVT), IFC for coordination, and PDF sheet sets (A1/A0). DWG/COBie can be added if required.
What payment terms do you use?
Standard terms: 40% advance, 40% midway, 20% at handover. EU reverse charge applies for eligible B2B clients under EU VAT rules.
What is the typical turnaround time?
For up to ~500 m², typical delivery is 7–14 days depending on disciplines, LOD, and revision rounds. Larger projects are scheduled as milestones during scoping.