We deliver BIM Metal Structures across the US and EU — from LOD 200 concepts to LOD 450 fabrication packs. Our Tekla/Revit teams model steel frames and connections, prepare GA/shop/assembly drawings, export NC/DXF, and comply with AISC, AWS, EN 1993 and EN 1090. Send your model or plans and get a firm quote in 24 hours.

Tekla · Revit · IFC EN 1993 · EN 1090 AISC · AWS Updated: —

BIM Metal Structures — USD/ton base rates by LOD

LOD 200

Concept model & coordination

USD/tScope
$190–$290Concept model, basic grids, early clash checks

LOD 300

Production model (no joints)

USD/tScope
$290–$410Main members, MTO/BOQ

LOD 350

Model with joints + specs

USD/tScope
$410–$690Bolted/welded joints, MTO, reports

LOD 400

Fabrication detailing

USD/tScope
$690–$990Marks, bolts/welds, shop/assembly details

LOD 450

Fabrication + erection pack

USD/tScope
$790–$1,290Shop/assembly sets, NC/DXF, lotting

Minimum order: $1,300. For light-gauge systems we can quote per m² ($10–$24/m²).

Region & complexity coefficients

Region / Codes

Region× / +
EU (EN 1993, EN 1090 EXC2)×1.00
EU EXC3/EXC4×1.05–×1.12
USA (AISC/AWS/OSHA)×1.08–×1.15
Seismic/wind (ASCE 7 / EN 1998)+10–20%

Complexity

Metric× / +
<35 connections/t×1.00
35–65 connections/t×1.15
>65 connections/t or custom nodes×1.30–×1.50
Stainless / CFS / high-class steel+10–25%

What’s included (LOD 350+)

Unified BIM environment

IFC/BCF, BEP-compliant naming, MTO/BOQ and reports.

Connections modeled

Bolted/welded joints, marking/lotting, revision control.

QA/QC & coordination

Weekly progress, clash summaries, tracked RFIs.

Add-ons (fixed)

Add-onRate
Joint check (IDEA/analog)$25–$39 / joint
Erection drawings (GA)$35–$59 / sheet or $14–$22 / t
Shop/assembly sets (A1/A2)$32–$49 / sheet
NC/DSTV/NC1, DXF$7–$12 / t
BIM coordination (RFI, clash fix)$22–$34/h or $110–$180 / 100 fixes

Typical throughput: 25–40 t/week/team (LOD 350–400). Rush 48–72 h: ×1.25–×1.50.

Volume discounts: >100 t −5%, >300 t −10%, 12-month framework −12%.

Worked examples

EU — Warehouse 520 t, EXC2, LOD 350

  • Base: 520 t × $520/t = $270,400
  • Connections density ×1.15 ⇒ $310,960
  • Shop drawings: 400 sheets × $39 = $15,600
  • NC/DSTV: 520 t × $9 = $4,680

Total: $331,240

USA — Pipe-racks 180 t, AISC, LOD 400, seismic

  • Base: 180 t × $690/t = $124,200
  • AISC ×1.12 ⇒ $139,104
  • Seismic +15% ⇒ $159,969.60
  • Erection sheets: 180 t × $18 = $3,240

Total: $163,210

FAQ — BIM Metal Structures

How do you measure the scope — per ton or per sheet?

We quote primarily in USD/ton based on the approved BOM/model weight. For light-gauge systems we can quote per m², with sheet-based add-ons for shop/erection sets.

Which codes do you follow?

EU: EN 1993 and EN 1090 (EXC2–EXC4). USA: AISC/AWS/OSHA. Seismic and wind are handled per ASCE 7 / EN 1998 using appropriate coefficients.

What do you need to start?

IFC/STEP or Tekla/Revit model, plans and sections, deliverables list, code requirements, target schedule and lot sizes for staged deliveries.

What is your typical delivery pace?

LOD 350–400: 25–40 t/week/team with weekly drops. Rush windows 48–72 hours apply multipliers ×1.25–×1.50.

Payment terms and exclusions?

30% advance, 40% mid-way, 30% on delivery. PE/SE stamps, on-site supervision and special materials (e.g., stainless, high-class steel) are quoted separately.

Get a 24-hour quote

Send files

Share IFC/STEP or Tekla/Revit model + scope. We will confirm weight, level of detail and deliverables, then send a firm quote.

Follow & social

We post updates on BIM, steel detailing and recruitment.

Company

MaViAl Sp. z o.o. — NIP 8971927502 • REGON 52642047900000

Wrocław, 50-078, ul. Stanisława Leszczyńskiego 4/29