BIM Reinforced Concrete — LOD 300–400 Rebar Detailing & USD/m² (US/EU)

Rebar BIM in Revit/Tekla: LOD 300–400, bar bending schedule (BBS), clash-free coordination and shop-ready drawings. Transparent USD pricing per m² or per ton. Updated: —

Revit / Tekla IFC · DWG · PDF · BBS (CSV/XLS) Eurocode 2 / ACI 318
LOD 300
Design / GA
LOD 350
Coordination
LOD 400
Rebar / Shop

Pricing — LOD packages and piece rates

LOD packages (price per m² GFA)

Package Included EU (USD/m²) US (USD/m²)
LOD 300 — Design/GA Analytical scheme, 3D model, GA plans/sections/details, concrete schedules. $6–$12 $8–$14
LOD 350 — Coordination + architectural/MEP coordination, openings & embeds, clash reports. $10–$18 $12–$20
LOD 400 — Rebar/Shop Most popular + rebar detailing LOD 400, BBS (CSV/XLS), tagging/marking, PDFs/DWG, IFC; NC if required. $19–$29 $24–$34
Minimum project budget Mobilization, setup, BEP, QC $2,200 $2,800
GFA — gross floor area. Alternative unit: tons of rebar for LOD 400.

Piece rates (quick partial scopes)

ItemEU (USD)US (USD)
Rebar detailing LOD 400 (per ton) $160–$260 /t $180–$290 /t
Full shop/working drawing set (A1/A0) $60–$120 /sheet $70–$140 /sheet
Stair flight / typical node (rebar + BBS) $200–$350 $240–$390
Complex beam/console (shop) $75–$150 $90–$175
Hourly (coordination / RFI / revisions) $25–$30 /h $30–$38 /h

Deliverables & standards included

Software & formats

  • Revit / Tekla native
  • IFC 2x3/4, DWG, PDF
  • Bar Bending Schedule (BBS) in CSV/XLS

Codes & standards

  • EU: Eurocode 2 (EN 1992) + National Annexes
  • USA: ACI 318 / ASTM; loads per ASCE 7

Quality & coordination

  • Clash reports (BCF/Navisworks)
  • Naming per BEP, traceable IDs
  • RFI response ≤ 48h
  • Two revision cycles included

Add-ons & surcharges (as needed)

Seismic / high seismicity

+10–20% on affected scopes (EC8 / ASCE 7)

Post-tensioned (PT)

+25–35% for PT elements

Precast / prestressed RC

+15–25%

Engineer stamp / calc report

$1,300–$4,200 per building, jurisdiction-dependent

Fast-track delivery

+20–35% (≥2× standard speed)

Delivery, SLA & quality control

Estimator, discounts & terms

Quick estimator

Estimated cost

Discounts

  • >10,000 m²/year: –10%
  • 12-month framework (prepaid sprints): –12% + priority SLA

Terms & inputs

  • Payment: 30% advance · 40% at 50% progress · 30% before IFC/shop release
  • Prices NET; tax/VAT as applicable per place of supply
  • Inputs: architectural model/drawings (DWG/IFC), loads/spec, BEP
  • Measuring unit: m² GFA or tons of rebar

FAQ — BIM RC pricing & delivery

How do you estimate $/m² vs $/t?

$/m² suits early or complete scopes (LOD 300–400). $/t fits LOD 400 rebar-only. We recommend the cheaper after reviewing your inputs.

What deliverables do I get at LOD 400?

Fully detailed rebar model, tagged sheets, BBS (CSV/XLS), PDFs/DWG, IFC, and if needed NC for bending machines.

Which codes do you follow?

EU: Eurocode 2 (EN 1992) with National Annexes. USA: ACI 318 / ASTM, with loads per ASCE 7. We align to your BEP and naming.

How fast can you start?

Kick-off in 2–5 business days after inputs and advance. RFI response ≤48h. Fast-track available.

How do revisions work?

Two revision cycles are included per stage. Extra scope is billed hourly or via an agreed sprint.

Related BIM & construction pages

Ready to scope your BIM RC project?

Send plans/model and we’ll return a fixed offer within 24–48h.