BIM Timber Structures (Mass Timber) — Design, Detailing & USD/m² Pricing
We deliver BIM Timber Structures across the US and EU — mass timber (CLT/GLT/LVL & timber frame). From LOD 200 concepts to LOD 400 fabrication packs, our Cadwork/Revit/Tekla teams prepare coordinated models, shop/assembly drawings and CNC (BTL/BTLx/BVN). Send your inputs and get a firm quote in 24 hours.
Instant estimator — BIM Timber Structures
Formula: Total = USD/m² × GFA × Complexity × Region + Options. Results are indicative; final scope per RFQ.
Optional items
- Typical SLA: LITE 5–10d / PRO 10–20d / FAB 15–30d per 1,000 m².
- First-project discount −10% or fixed price for pilot ≤300 m².
BIM Timber Structures — price list (USD)
Total = USD/m² × GFA × Complexity × Region + Options
LITE LOD200
Concept model, quantities, early clashes, PDF/IFC.
$8–$12/m² · Min. $1,300
PRO LOD300–350
Architectural/structural model, project-level details, specs/BOQ, BIM coordination.
$15–$25/m² · Min. $4,200
FAB LOD400
Production model, panel/beam layouts, tagging, fabrication issues.
$26–$45/m² · Min. $7,900
| Service | Unit | Price, $ |
|---|---|---|
| Connection detailing (simple/complex) | per connection | 15–45 |
| Shop drawings (unique elements) | per element | 15–39 |
| Sheet set (GA/Assembly) | per sheet | 190–320 |
| CNC prep (BTL/BTLx/BVN, nesting) | per m³ timber | 39–69 |
| IFC4 export / Navisworks/BIMcollab coordination | per milestone | 490–950 |
| Parametric families/details | per family | 29–69 |
| Author supervision (remote) | $ / h | 39–59 |
| Rush mode (30–40% faster) | coefficient | +25–40% |
Region & complexity coefficients
- USA × 1.12 — IBC/NDS/ASCE 7 specifics and vendor/file coordination.
- EU (Eurocode 5 / EN 1995) × 1.00 baseline.
- DACH/UK/NL/Scandinavia × 1.08.
- High complexity × 1.30 — intersections, double curvature, free-form.
- Repetition/typified plans: discounts up to −12%.
Deliverables
- BIM model per LOD, sheets PDF/DWG/IFC, BOQ/spec, clash reports.
- FAB: tagging, element list, CNC files (BTL/BTLx/BVN).
- QA/QC checklists, clash log, CLT/GLT/LVL tolerances control.
- PE/SE stamps not included; we can work with your licensed engineer or recommend one.
Timeline & SLA
- LITE: 5–10 business days / 1,000 m²
- PRO: 10–20 business days / 1,000 m²
- FAB: 15–30 business days / 1,000 m²
- Kick-off in 24h after NDA + inputs (DWG/IFC/PDF)
Time & Material rates
- BIM Modeler: $32–$45/h
- Timber Detailer/Fabrication: $49–$79/h
- BIM Coordinator/Clash: $45–$69/h
- Parametric/Plugins (Revit/Cadwork): $59–$89/h
Example A — 240 m² timber frame (EU), PRO + basic shops
- Base: 240 × $17 = $4,080 → min. PRO $4,200
- Shop drawings: 160 × $18 = $2,880
- Total ≈ $7,080
Example B — 4,800 m², 6-storey CLT/GLT (EU), FAB
- Area: 4,800 × $27 = $129,600
- Milestones: 2 × $750 = $1,500
- Connections: 1,100 × $16 = $17,600
- Shop drawings: 1,000 × $18 = $18,000
- CNC: 500 m³ × $49 = $24,500
- Total ≈ $191,200
Codes & compliance (US/EU)
- US: IBC, NDS for Wood Construction, ASCE 7 for loads; seismic/wind coordination noted in deliverables.
- EU: Eurocode 5 (EN 1995-1-1) with national annexes where provided.
- Fire, acoustic and serviceability notes reflected on sheets when specified by the client.
Related BIM & construction pages
Contact & messengers
MaViAl Sp. z o.o.
KRS 0001058460 • NIP 8971927502 • REGON 52642047900000
Wrocław, 50-078, ul. Stanisława Leszczyńskiego 4/29
BIM Timber — FAQ
What LOD do I need for permits and fabrication?
Permits typically use LOD300–350 (PRO). Fabrication and CNC require LOD400 (FAB) with element IDs and tolerances.
Do you cover USA codes?
Yes. The USA modifier ×1.12 accounts for IBC/NDS/ASCE 7 specifics and vendor/file coordination. PE/SE stamps are excluded.
Can you deliver BTL/BTLx/BVN?
Yes, for CLT/GLT/LVL elements. We prepare CNC files and nesting per supplier requirements.
How fast can we start?
Within 24h after NDA and inputs (DWG/IFC/PDF). A pilot ≤300 m² can be fixed-price with −10% for the first project.