BIM Timber Structures (Mass Timber) — Design, Detailing & USD/m² Pricing

We deliver BIM Timber Structures across the US and EU — mass timber (CLT/GLT/LVL & timber frame). From LOD 200 concepts to LOD 400 fabrication packs, our Cadwork/Revit/Tekla teams prepare coordinated models, shop/assembly drawings and CNC (BTL/BTLx/BVN). Send your inputs and get a firm quote in 24 hours.

Cadwork · Revit · Tekla · IFC LOD 200–400 CNC: BTL/BTLx/BVN Updated: —

Instant estimator — BIM Timber Structures

Formula: Total = USD/m² × GFA × Complexity × Region + Options. Results are indicative; final scope per RFQ.

Optional items

Estimated total

$ 7,080

Get a tailored quote
  • Typical SLA: LITE 5–10d / PRO 10–20d / FAB 15–30d per 1,000 m².
  • First-project discount −10% or fixed price for pilot ≤300 m².

BIM Timber Structures — price list (USD)

Total = USD/m² × GFA × Complexity × Region + Options

LITE LOD200

Concept model, quantities, early clashes, PDF/IFC.

$8–$12/m² · Min. $1,300

PRO LOD300–350

Architectural/structural model, project-level details, specs/BOQ, BIM coordination.

$15–$25/m² · Min. $4,200

FAB LOD400

Production model, panel/beam layouts, tagging, fabrication issues.

$26–$45/m² · Min. $7,900

Service Unit Price, $
Connection detailing (simple/complex)per connection15–45
Shop drawings (unique elements)per element15–39
Sheet set (GA/Assembly)per sheet190–320
CNC prep (BTL/BTLx/BVN, nesting)per m³ timber39–69
IFC4 export / Navisworks/BIMcollab coordinationper milestone490–950
Parametric families/detailsper family29–69
Author supervision (remote)$ / h39–59
Rush mode (30–40% faster)coefficient+25–40%

Region & complexity coefficients

  • USA × 1.12 — IBC/NDS/ASCE 7 specifics and vendor/file coordination.
  • EU (Eurocode 5 / EN 1995) × 1.00 baseline.
  • DACH/UK/NL/Scandinavia × 1.08.
  • High complexity × 1.30 — intersections, double curvature, free-form.
  • Repetition/typified plans: discounts up to −12%.

Deliverables

  • BIM model per LOD, sheets PDF/DWG/IFC, BOQ/spec, clash reports.
  • FAB: tagging, element list, CNC files (BTL/BTLx/BVN).
  • QA/QC checklists, clash log, CLT/GLT/LVL tolerances control.
  • PE/SE stamps not included; we can work with your licensed engineer or recommend one.

Timeline & SLA

  • LITE: 5–10 business days / 1,000 m²
  • PRO: 10–20 business days / 1,000 m²
  • FAB: 15–30 business days / 1,000 m²
  • Kick-off in 24h after NDA + inputs (DWG/IFC/PDF)

Time & Material rates

  • BIM Modeler: $32–$45/h
  • Timber Detailer/Fabrication: $49–$79/h
  • BIM Coordinator/Clash: $45–$69/h
  • Parametric/Plugins (Revit/Cadwork): $59–$89/h

Example A — 240 m² timber frame (EU), PRO + basic shops

  1. Base: 240 × $17 = $4,080 → min. PRO $4,200
  2. Shop drawings: 160 × $18 = $2,880
  3. Total ≈ $7,080

Example B — 4,800 m², 6-storey CLT/GLT (EU), FAB

  1. Area: 4,800 × $27 = $129,600
  2. Milestones: 2 × $750 = $1,500
  3. Connections: 1,100 × $16 = $17,600
  4. Shop drawings: 1,000 × $18 = $18,000
  5. CNC: 500 m³ × $49 = $24,500
  6. Total ≈ $191,200

Codes & compliance (US/EU)

  • US: IBC, NDS for Wood Construction, ASCE 7 for loads; seismic/wind coordination noted in deliverables.
  • EU: Eurocode 5 (EN 1995-1-1) with national annexes where provided.
  • Fire, acoustic and serviceability notes reflected on sheets when specified by the client.

Contact & messengers

MaViAl Sp. z o.o.
KRS 0001058460 • NIP 8971927502 • REGON 52642047900000
Wrocław, 50-078, ul. Stanisława Leszczyńskiego 4/29

+48 536-198-779+49 1522 770 4748
vialtim@gmail.com

Request for quote

By sending you agree to be contacted regarding your project.

BIM Timber — FAQ

What LOD do I need for permits and fabrication?

Permits typically use LOD300–350 (PRO). Fabrication and CNC require LOD400 (FAB) with element IDs and tolerances.

Do you cover USA codes?

Yes. The USA modifier ×1.12 accounts for IBC/NDS/ASCE 7 specifics and vendor/file coordination. PE/SE stamps are excluded.

Can you deliver BTL/BTLx/BVN?

Yes, for CLT/GLT/LVL elements. We prepare CNC files and nesting per supplier requirements.

How fast can we start?

Within 24h after NDA and inputs (DWG/IFC/PDF). A pilot ≤300 m² can be fixed-price with −10% for the first project.